Platform Architecture · 6 Departments

Six departments. Any one can lead.

No fixed hierarchy. The event decides who takes point. A structural variant: Engineering moves first. A forfeiture deadline: Legal drives alone. A 1,000-invoice batch: Procurement scales to 1,000 parallel workers. The right specialist leads. You validate the result.

How you trigger the event
Type the brief. The right department leads.
Scroll to advance
Vonbuild · Live Session
Programme the steel framing delivery for Lot 03 and verify it fits the May 12 RDC casting window.
Type a request or pick from the Marketplace…
Architecture · Polycentric model

The event decides who leads.

There is no permanent boss department. A project event triggers the right specialist automatically. Each can operate alone or call in others — without you coordinating the handoff.
ENGINEERING LEADS
3 days → 20 min

Structural variant — Friday 4pm

The client emails a modified load path. Monday's coordination meeting is fixed. Engineering calculates the structural delta, quantifies the cost impact, and flags any triggered notification deadline. Legal, Procurement, and Operations are spawned in parallel — contracts checked, supply chain rescoped, schedule updated. The consolidated impact note lands on your screen Saturday morning.
Leads
Master Engineering
Supports
Legal · Procurement · Operations
LEGAL LEADS
always-on

Forfeiture deadline — T-7 days

Legal operates alone. It scans every contract in your portfolio, surfaces any notification window closing within 7 days, extracts the exact CCAG or FIDIC sub-clause, and drafts the notification letter with the supporting evidence chain. No other department is called. Nothing leaves without your validation and your click.
Leads
Master Legal
Supports
Sole driver
PROCUREMENT LEADS
1 week → 4 hours

1,000-invoice batch — end of month

Procurement instantiates 1,000 parallel workers — one per invoice. Each cross-references the corresponding BOQ line, validates the progress percentage against site measurements, and flags deviations against the Schedule of Rates. 3–5% overbilling documented, with evidence, in four hours. A week of senior QS time, in the background, while you run your Monday meeting.
Leads
Master Procurement
Scale
1,000 parallel workers
SALES LEADS
6 wk → 1 wk

600-page RFP — submission in 3 weeks

Sales builds the technical proposal, pricing strategy, and win plan. It calls Engineering to verify the method statement's technical assumptions and confirm normative references. 24 months of your firm's winning bids, standard method statements, and trade-specific rates are pulled from the knowledge graph and woven into a responsive, specific submission — not a recycled template.
Leads
Master Sales
Supports
Master Engineering
Live demo · Polycentric in motion

The shared project graph the model produces.

Multi-project, multi-Master, multi-user. The event decides who leads; the graph records who saw what, when. Different views per role — same source of truth.

3 contributors · 3 SharePoint departments · 1 shared project graph

Each user uploads their own folder. The Vonbuild knowledge graph stitches everything together — automatically, with cognitive confidentiality.
Architecture · Fractal execution

One instruction. Unlimited workers.

Each department is a factory. When the volume requires it, a Master instantiates as many workers as the task demands — simultaneously, in the background. Your headcount stays the same.

A single plan revision triggers 5 Masters in parallel

No coordination meeting · no manual dispatch · no information loss
47
Variations analysed in parallel
3 min
vs. 3 days for a senior
1 → N
Workers per task, no ceiling
The six departments

Each department. Its signature task.

47 workflows across the six departments. Each sub-page carries the full scenario library for one specialist. Start with the one that matches your most expensive problem today.
Engineering
6 wk → 5 days

Master Engineering

200-page permit calculation note, run inside Robot or ETABS.
Eurocode verifications EC2 / EC3 / EC7. Every element, every clause, fully cited and auditable. Also: structural optimisation, seismic retrofit, heritage surveys, retiring-engineer knowledge capture.
Explore Engineering →
Legal
3 wk → 3 days

Master Legal

Claim file built from 400 project documents — full evidence chain.
CCAG, FIDIC, NEC, VOB/B, JCT. Forfeiture deadline patrol across every project. Concurrent delay analysis. Multi-jurisdiction PPP review.
Explore Legal →
Procurement
impossible → 4 hours

Master Procurement

1,000 invoices scanned for overbilling. 3–5% routinely recovered.
Bid-rigging detection across 24 months. Multi-criteria supplier qualification (technical, financial, ESG, capacity). Category strategy with hedging plans.
Explore Procurement →
Sales
6 wk → 1 wk

Master Sales

600-page RFP response — technical proposal through win plan.
24 months of firm precedent reused. Competitor pricing reverse-engineered from lost bids. Risk-adjusted P&L for PPP, design-build, and alliance contracts.
Explore Sales →
Operations
2 wk → 2 days

Master Operations

Recover a 3-month delay — critical path, options, negotiation letter.
5,000-document as-built handover. 15+ subcontractors coordinated with conflicting schedules. Multi-program portfolio reporting for development directors.
Explore Operations →
Generalist
always-on

Master Generalist

Decomposes complex instructions. Orchestrates every other department.
When no single department owns the task — or when all five need to coordinate simultaneously — the Generalist takes point. Roadmaps, 360° project scans, cross-department impact assessments.
Explore Generalist →
Architecture · Extensions

Your firm's methods outlive your seniors.

An Extension is a reusable routine — a normative script, a review protocol, a verification workflow — that the agents execute on every relevant project. Three tiers. All managed from the internal Marketplace.
Global
pre-integrated

Industry standards

The platform ships with the normative corpus your work runs on. No configuration, no upload required.
Eurocodes EC1 / EC2 / EC3 / EC5 / EC7
CCAG 2021 · SIA 118 · FIDIC · VOB/B · JCT
DTU series · NF EN standards
PMP / PRINCE2 adapted for AEC
Company
your competitive edge

Your methods, executable.

The way your firm reviews a CCAP, validates a progress claim above 10M, or runs a peer-review on a calculation note — encoded once, executed every time across the entire organisation.
Invoice validation process (tiered by contract value)
Proprietary quality control checklists
Internal estimation methods and rate tables
Reporting templates and sign-off protocols
Auto-generated
on demand

The agent creates the tool.

If a calculation or verification routine doesn't exist in the library, Master Engineering codes it — a Python script, tested against known outputs, registered as a new Extension, available to the whole organisation from that moment forward.
Captures senior corrections as they happen
Versioned, with rollback and audit trail
Shared across teams, projects, and departments
Discoverable in the internal Marketplace
Inside the app · Marketplace

Where every Extension lives.

Global standards, company protocols, auto-generated mini-apps — one searchable library. DSI governance gates promotion from project-scope to tenant-wide.

Extensions

Context
vonbuild·Org=design_officeFunc=engineering
Filters
Organisation:design_office×Function:engineering×Disable auto-filters
+ Filter
Clear all
Plugins9— groups skills + agents + commands
Legal & Contractspluginvonbuild

Construction contract analysis, claims management and legal risk assessment

7 / 26 workspaces· Legal
1 skill
Estimation & Costingpluginvonbuild

Construction estimation — DPGF/DQE/BOQ analysis, quantity validation and unit price comparison

Active everywhere· Sales
2 skill
Site Operationspluginvonbuild

Site supervision, defect tracking, daily reports and works acceptance

7 / 26 workspaces· Ops
1 skill
Planning & Orchestrationpluginvonbuild

Multi-agent orchestration — workspace scan, document classification and execution roadmap generation

10 / 26 workspaces· Plan
1 agent
Procurement & Subcontractingpluginvonbuild

Supplier management, invoice verification, subcontract tracking

3 / 26 workspaces· Proc
1 skill
Technical Directionpluginvonbuild

Technical feasibility, pre-construction studies, engineering review (Eurocode / DTU / SIA)

3 / 26 workspaces· Tech
1 skill
Skills7— not attached to a plugin
DTU StandardsskillvonbuildFR

DTU pitfalls — installation errors causing non-conformities and insurance claims.

9 / 26 workspaces
SIA StandardsskillvonbuildCH

SIA standards — Swiss federation of engineers and architects technical norms

5 / 26 workspaces
FIDIC Contractsskillvonbuild

Standard FIDIC contracts — Red, Yellow, Silver books for international construction

5 / 26 workspaces
CCAG TravauxskillvonbuildFR

CCAG general administrative clauses for public works in France

5 / 26 workspaces
MCP3
Revit 2027mcptenant

Autodesk Revit 2027 — BIM model querying, family extraction, clash detection via Computer Use.

0 / 26 workspaces
ERP 2027mcptenant

Sage / Cegid ERP 2027 — purchase orders, supplier ledgers, situation reports.

Active everywhere
HubSpotmcptenant

HubSpot CRM — deals, contacts, pipeline sync for the Sales tower.

0 / 26 workspaces
Governance

The agents prepare. You decide.

Every action with financial, legal, or contractual weight waits for your approval before leaving the system. Your existing Microsoft 365 or Google Workspace identity policies carry over automatically — no new security perimeter, no new vendor approval process with IT.

Full security and governance architecture →

Start with your most expensive problem.

Each department sub-page carries the scenarios, workflows, and evidence for one specific area of work. Find the one that matches your hardest task today.